Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

Amirkhanian, S N, Burati, J L and Mirchandani, H C (1994) Effect of Testing Variability on Contractor Payment for Asphalt Pavements. Journal of Construction Engineering and Management, 120(03), 579–92.

Cohenca‐Zall, D, Laufer, A, Shapira, A and Howell, G A (1994) Process of Planning during Construction. Journal of Construction Engineering and Management, 120(03), 561–78.

El‐Itr, Z and Kangari, R (1994) Minority Contractors: Framework for New Policy Development. Journal of Construction Engineering and Management, 120(03), 632–48.

Everett, J G and Farghal, S (1994) Learning Curve Predictors for Construction Field Operations. Journal of Construction Engineering and Management, 120(03), 603–16.

Gavilan, R M and Bernold, L E (1994) Source Evaluation of Solid Waste in Building Construction. Journal of Construction Engineering and Management, 120(03), 536–52.

Gugel, J G and Russell, J S (1994) Model for Constructability Approach Selection. Journal of Construction Engineering and Management, 120(03), 509–21.

Jergeas, G F and Hartman, F T (1994) Contractors' Construction‐Claims Avoidance. Journal of Construction Engineering and Management, 120(03), 553–60.

Laborde, M and Sanvido, V (1994) Introducing New Process Technologies into Construction Companies. Journal of Construction Engineering and Management, 120(03), 488–508.

Mahoney, J J and Tatum, C B (1994) Construction Site Applications of CAD. Journal of Construction Engineering and Management, 120(03), 617–31.

Reyna, S M, Vanegas, J A and Khan, A H (1994) Construction Technologies for Sewer Rehabilitation. Journal of Construction Engineering and Management, 120(03), 467–87.

Suhail, S A and Neale, R H (1994) CPM/LOB: New Methodology to Integrate CPM and Line of Balance. Journal of Construction Engineering and Management, 120(03), 667–84.

Swiggum, K E, Anderson, S D and Russell, J S (1994) Case Study of Burlington Cable‐Stayed Bridge. Journal of Construction Engineering and Management, 120(03), 649–66.

  • Type: Journal Article
  • Keywords: ASCE Awards & Prizes; Case reports; Bridges, cable‐stayed; Bridge construction; Construction methods; Constructability; Innovation;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1994)120:3(649)
  • Abstract:
    Cable‐stayed bridges are becoming increasingly popular in the United States. However, the lack of experience in cable‐stayed bridge construction may lead to unsuccessful projects including cost overruns and schedule delays. In light of these potential problems, a need exists to document the methods of construction used in past cable‐stayed bridge projects. This paper documents the construction of the Burlington Cable‐Stayed Bridge. Throughout the paper, issues regarding constructability and innovation are highlighted. Interviewed project participants agreed that this project was successful. The success is measured by the ability of contractors, subcontractors, material suppliers, and inspectors to deliver a project on time and within budget. This case study describes the general characteristics of the project, significant construction methods and techniques, and factors contributing to project success.

Tsimberdonis, A I and Murphree, E L (1994) Equipment Management through Operational Failure Costs. Journal of Construction Engineering and Management, 120(03), 522–35.

Woolery, J C (1994) Developing Specifications for Cellular‐Telephone Base Stations. Journal of Construction Engineering and Management, 120(03), 593–602.